Register Number | U.2.26 climbing scaffolds |
---|---|
Description | note: in the following positions, the median original value is not only determined on a piece-by-piece, but also on a weight- and area-related basis, as the piece-by-piece evaluation does not make sense due to the large number of pieces. This method allows the determination of the median original value for each part, as the commodity catalogues of the manufacturers specifiy the weight and area of each individual part. Independent of the method chosen for the MOV evaluation, a piece-by-piece management based on the catalogues is still possible. these scaffolds are either fastened to concrete structures or attached to climbing formwork, the scaffolds are assembled with heavy brackets, handrails and floor coverings Group 1: climbing scaffold with suspended working platform Group 2: climbing scaffold with transfer formwork; this solution permits erecting and stripping of the formwork without the help of a crane which is only required for the transfer of the complete assembly (working platform plus formwork) |
Classification | due to replacement value |
Um sich die Details der Gerätearten anschauen zu können loggen Sie sich bitte ein.
Lizenzen zur Nutzung der BGL-Online können Sie hier erwerben:
BGL-Online in der Profil-Buchhandlung
ÖBGL-Online in der Profil-Buchhandlung